Data analytics

Qingyang 'East Data, West Computing' Cost Analysis

Analysed the cost structure of the Qingyang East Data West Computing project, built a cost estimation model and produced an input-output report.

Role
Cost data and report writing
Period
2023.03 – 2023.05
Status
Completed
Team
Commissioned analysis project
Qingyang 'East Data, West Computing' Cost Analysis cover

Background and problem

The “East Data, West Computing” project involves multiple categories of investment — data centres, energy, network and operations — so scattered cost data had to be organised into comparable definitions before the input-output relationship could be assessed.

Constraints

  • Public data is limited, so some costs had to be estimated from industry parameters.
  • The project timeline was short (about 3 months), requiring usable conclusions within a limited time.
  • The report targets non-technical readers, so conclusions must be traceable.

Approach and architecture

First establish a cost classification framework (construction, energy, network, operations), then collect and verify data item by item, build a cost estimation model, and finally carry out input-output analysis and scenario comparison.

Key decisions

  • Classify first: unify cost categories to avoid double counting.
  • Transparent parameters: estimation parameters and their sources are listed in the report for review.
  • Scenario analysis: present baseline, optimistic and conservative scenarios rather than a single-point conclusion.

Results and measurement

Completed the collection and organisation of cost data, contributed to building the cost estimation model, and independently completed the input-output analysis report, providing a structured basis for decision discussions.

Technical details

  • Broke down cost categories such as data centre, power, network and operations.
  • Used a cost estimation model to connect capacity, unit price and scenario assumptions.
  • Independently completed the input-output analysis and the report presentation.

Reflection

The credibility of estimation research depends on the sources of its parameters. If I did it again, I would record a source and confidence level for every parameter and add sensitivity analysis.

Scope and security

This is a static case study. The page does not run project code or collect uploads, logins or visitor data. Metrics come from project records and local experiments; reproduce details from the source or report. Read the site security model →

Command palette

Esc

↑↓ selectEnter runEsc close